Custom Fuel System Redesign Increases Efficiency and Reliability
Prime Power Case Study
Client: Leading Financial Services Institution
Industry: Commercial
A leading banking
company's Tampa campus is home to more than 10,000 employees and 25 onsite
businesses, featuring seven buildings and a large data center. The campus
includes two main generators, one of which required a fuel system redesign to
utilize fuel level switches for automated control of tank levels and fuel flow,
enhancing efficiency and reliability.
Results:
After rigorous
testing to ensure functionality, the new design proved highly efficient and resulted
in significant cost savings compared to a full system replacement.